Zanran
✓ Graphs ✓ Tables ✓ Reports
 
Format: www.xyz.com or *.gov
Where ▼
Where ▲
Date:
Note: Results will be PDF and Excel – which we can date reliably. For PDFs, it will either be the date the PDF was creater, or the date visible in the graph or chart.
When ▼
When ▲
What ▼
What ▲

Data & statistics on Central Bank Lending Rate – 29 results

Hover over me
Average lending and Central Bank (CB) bills interest rates

Average lending and Central Bank (CB) bills interest rates

www-wds.worldbank.org/external/default/WDSContentServer/IW3P/IB/2011/08/22/000158349_20110822101635/Rendered/PDF/WPS5770.pdf

Chart 11. Average lending and Central Bank (CB) bills interest rates CB bills interest rate (in %, on annual basis) Average lending interest rate on denar credits (in %, on annual basis) Source: NBRM ...
to the increase of the average lending interest rate (by 0.4 percent). In both years ...
when there is a declining trend of the NBRM interest rate. The opposite direction of the main monetary policy rate, the increase in 2004, was not followed by the banks (see Chart 11

2107 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/IW3P/IB/2011/08/22/000158349_20110822101635/Rendered/PDF/WPS5770.pdf
Average lending and deposit-taking interest rates

Average lending and deposit-taking interest rates

www-wds.worldbank.org/external/default/WDSContentServer/IW3P/IB/2011/08/22/000158349_20110822101635/Rendered/PDF/WPS5770.pdf

not borrow from the central bank but invest in its short-term securities. In the past ...
in the banks’ interest rates, and it resulted in a declining trend of the lending interest ...
Chart 10. Average lending and deposit-taking interest rates Average lending interest rate on denar credits (in %, on annual basis) Average interest rate on denar deposits (in %, on annual basis) Source: NBRM

2107 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/IW3P/IB/2011/08/22/000158349_20110822101635/Rendered/PDF/WPS5770.pdf
Full Regression Results Dependent Variable: Incremental World Bank Lending in USD million Crisis Indicator: Change in GDP Growth Rate (Forecast versus Actual)

Full Regression Results Dependent Variable: Incremental World Bank Lending in USD million Crisis Indicator: Change in GDP Growth Rate (Forecast versus Actual)

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

Lending in USD million Crisis Indicator: Change in GDP Growth Rate (Forecast versus Actual) Dependent Variable: Incremental World Bank Lending in USDmln Model 3 Model ...
crisis lending (mean-centered), and pre-crisis lending squared, the interaction term ...
dummy and pre-crisis volume of lending, and the interaction term for the World Bank dummy and pre-crisis volume of lending squared. (S5) also includes controls

2097 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
Full Regression Results Dependent Variable: Incremental World Bank Lending as % of GDP Crisis Indicator: Change in GDP Growth Rate (Forecast versus Actual)

Full Regression Results Dependent Variable: Incremental World Bank Lending as % of GDP Crisis Indicator: Change in GDP Growth Rate (Forecast versus Actual)

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

Lending as % of GDP Crisis Indicator: Change in GDP Growth Rate (Forecast versus Actual) Dependent Variable: Incremental World Bank Lending as % of GDP Model 1 Model ...
APPENDIX B ‐0.007171 (0.205) Pre‐crisis country risk rating CPIA (0.421) Pre‐crisis share of World Bank in major donor lending as % of GDP ‐0.6324 (0.341) ‐0.2495** (0.044) Log of GDP per capita (2005‐07) ‐0.08557 (0.754) EAP ‐0.1479 (0.638) ECA ...
in GDP growth rate (Forecast vs Actual for 2009) (0.481) (0.439) (0.379) (0.353) (0.356) (0

2084 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
Full Regression Results Dependent Variable: Incremental World Bank Lending as % of GDP Crisis Indicator: Composite Crisis Indicator (principal factor score)

Full Regression Results Dependent Variable: Incremental World Bank Lending as % of GDP Crisis Indicator: Composite Crisis Indicator (principal factor score)

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

that borrowed from both the World Bank and ADB, between 2005 and 2010, Bank lending ...
lending of $7.8 billion versus $9.1 billion).46 During the crisis period (2009– 10), increase in Bank lending was also higher than that of ADB (107 percent versus 69 ...
Lending as % of GDP Crisis Indicator: Composite Crisis Indicator (principal factor score) Dependent Variable: Incremental World Bank Lending as % of GDP Model 4 Model

2079 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
Summary of Regression Results Dependent Variable: Incremental Lending by World Bank and Other Major Donors excl. IMF/EIB/EU as % of GDP Independent Variable of Interest: World Bank*Crisis Intensity Specifications (S1)-(S4)

Summary of Regression Results Dependent Variable: Incremental Lending by World Bank and Other Major Donors excl. IMF/EIB/EU as % of GDP Independent Variable of Interest: World Bank*Crisis Intensity ...

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

for relative size of economy in 2005-07, log of population, pre crisis lending. (H2 ...
and also includes CPIA. (H4) is same as (H2) and also includes pre-crisis country risk rating ...
donor lending. (H6) is same as (H2) except that log of population is replaced

2080 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
Service charge of 0.75 percent on disbursed balances

Service charge of 0.75 percent on disbursed balances

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

website; Central Bank Rates from Central bank websites; commercial lending rates ...
by November 30, 2009, the lending rate will be 0.20% lower based on a contractual spread ...
on disbursed the disbursed balance balances outstanding. The maximum Commitment Charge Rate

2027 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
Gross foreign exchange reserves

Gross foreign exchange reserves

www-wds.worldbank.org/external/default/WDSContentServer/IW3P/IB/2011/08/22/000158349_20110822101635/Rendered/PDF/WPS5770.pdf

banks do not borrow from the central bank but invest in its short-term securities ...
in the banks’ interest rates, and it resulted in a declining trend of the lending interest ...
interest rate in this period was reduced seven times, thus bringing it

2109 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/IW3P/IB/2011/08/22/000158349_20110822101635/Rendered/PDF/WPS5770.pdf
Dependent Variable: Incremental Lending by Other Major Donors (excl. IMF/EIB/EU) as % of GDP Incremental Lending defined as CY05‐07 vs. CY08‐10 for ADB, AFDB, EBRD and IADB

Dependent Variable: Incremental Lending by Other Major Donors (excl. IMF/EIB/EU) as % of GDP Incremental Lending defined as CY05‐07 vs. CY08‐10 for ADB, AFDB, EBRD and IADB

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

APPENDIX B APPENDIX B ...
Additional Specifications Model 7 Model 4 Model 5 Model 6 Model 8 Model 9 ‐0.03155 (0.241) ‐0.03822 (0.182) ‐0.02150 (0.413) ‐0.04297 (0.188) ‐0.01677 (0.563) ‐0.01132 (0.692) ‐0.01468** (0.017) ‐0.01346** (0.022) ‐0.01041* (0.062) ‐0.01558* (0.052) ... ...
1914 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 1927 1928 1929 1930 1931 1932 1933 1934 1935 1936 1937 1938 1939 1940 1941 1942 1943 1944 1945 1946 1947 1948 1949 1950 1951 1952 1953 1954 1955 1956 1957 1958 1959 1960 1961 1962 1963 ...

2053 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
Dependent Variable: Incremental Lending by Other Major Donors (excl. IMF/EIB/EU) in USD million Incremental Lending defined as CY05‐07 vs. CY08‐10 for ADB, AFDB, EBRD and IADB

Dependent Variable: Incremental Lending by Other Major Donors (excl. IMF/EIB/EU) in USD million Incremental Lending defined as CY05‐07 vs. CY08‐10 for ADB, AFDB, EBRD and IADB

www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf

APPENDIX B APPENDIX B ...
Model 4 Model 5 Model 6 Model 7 Model 8 Model 9 ‐6.6607* (0.068) ‐7.0910* (0.057) ‐7.2172** (0.038) ‐6.5211* (0.060) ‐7.7555* (0.075) ‐7.9283* (0.073) ‐1.7951* (0.050) ‐1.8522* (0.059) ‐1.7944** (0.031) ‐1.7192* (0.051) ‐2.6528*** (0.009) ‐2.2600** ( ... ...
2068

2068 (projection) | Documents & Reports - All Documents
Original Url: http://www-wds.worldbank.org/external/default/WDSContentServer/WDSP/IB/2012/03/05/000356161_20120305010422/Rendered/PDF/672830WP0Box3600crisis20full0report.pdf
◀ Prev 1 2 3 Next ▶
Related searches: composition of total world bank education lending, gdp per capita growth versus lending rate, changes in gdp growth rate, total world bank lending in baltic sea countries, bank lending rate in mongolia mongolia lending rate

Hints & help

Language. English only please... for now.
Phrase search. You can use double quotes to make phrases (e.g. "mobile phones").
Booleans. You can use a plus ‘+’ to make a word mandatory, or a minus ‘–‘ to exclude it (e.g. +gas –oil production)
Vocabulary. We have only limited synonyms - please try different words in your query.
Questions? Please email us: helpdesk [at] zanran [dot] com
About Feedback PDF wizardry Twitter LinkedIn facebook Google+